Project Overview

Project Name:

Bathroom Addition Project

Date:

2025

Location:

Los Angeles, CA

Completed bathroom addition with double sinks and upgraded finishes

This Bathroom Addition Project transformed an unfinished space into a fully functional, modern bathroom complete with new plumbing, insulation, drywall finishing, tile installation, a built-in bathtub, and a double-sink vanity. The project focused on maximizing comfort, improving layout efficiency, and creating a clean, bright environment.

The final design features upgraded tile surfaces, energy-efficient windows, a custom vanity, and high-quality fixtures. These improvements enhance daily convenience while adding long-term value to the home.

Key Features

Every detail of this bathroom addition was planned to deliver a modern, durable, and highly functional space.

Finished & Painted Drywall

Smooth, primed, and painted drywall replaced rough construction surfaces, creating a polished foundation for the bathroom design.

icon

Double-Sink Vanity Installation

A custom floating vanity with dual sinks was added, improving convenience and maximizing countertop space.

Addition Los Angeles Bathroom Addition

Premium Tile & Fixtures

High-quality wall and floor tile, a built-in bathtub, and modern plumbing fixtures bring a sleek, luxurious feel.

Project Development Process

Our team ensured precision, safety, and compliance during every stage of the bathroom addition.

01

Planning & Plumbing Layout

We mapped drain, vent, water supply, and electrical lines to support a dual-sink vanity and bathtub installation.

02

Construction & Drywall Finishing

Drywall was fully finished, sanded, primed, and painted to create a flawless surface ready for final materials.

03

Final Installation & Detailing

Vanity, sinks, fixtures, tile, trim, and lighting were installed to complete a premium bathroom transformation.

Project Challenges & Solutions

Bathroom additions require precise coordination of plumbing, ventilation, and waterproofing. Here’s how we overcame the challenges:

Project Problems:

Plumbing Configuration:

The space required new hot/cold supply lines and drains for a double-sink vanity.

Drywall & Moisture Resistance:

The walls needed proper finishing and sealing to withstand bathroom humidity.

Layout Optimization:

Ensuring enough space for a vanity, bathtub, and walkway required careful planning.

Project Solutions:

Professional Plumbing Setup:

Hot/cold lines and drainage were installed to code and tested for durability.

Moisture-Resistant Finishes:

Proper waterproofing, tile work, and premium paint protect walls from humidity.

Smart Space Planning:

The layout was optimized for comfort, flow, and accessibility.

Everything You Need to Know

Most bathroom additions take 6–12 weeks depending on plumbing work and material choices.

Yes — permits are required for plumbing, electrical, ventilation, and structural changes. We handle the entire process.

Absolutely — we offer full customization including cabinetry, countertops, tile styles, and fixture finishes.

Yes — bathroom additions offer one of the highest returns on investment in home remodeling.

Yes — we extend all necessary utilities, including water lines, drainage, electrical outlets, lighting, and ventilation.